BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Tampa Bay Regional Planning Council - ECPv6.15.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Tampa Bay Regional Planning Council
X-ORIGINAL-URL:https://tbrpc.org
X-WR-CALDESC:Events for Tampa Bay Regional Planning Council
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20280312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20281105T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20290311T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20291104T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20261022T130000
DTEND;TZID=America/New_York:20261022T150000
DTSTAMP:20261020T091544
CREATED:20260818T132036Z
LAST-MODIFIED:20260818T132036Z
UID:10001251-1792674000-1792681200@tbrpc.org
SUMMARY:Tampa Bay Coastal Master Plan - Joint Workgroup Meeting
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/tampa-bay-coastal-master-plan-joint-workgroup-meeting-2/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Hybrid: In-Person and Online Event
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2025/09/TBCMP-1-scaled.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20261027T093000
DTEND;TZID=America/New_York:20261027T110000
DTSTAMP:20261020T091544
CREATED:20251217T163153Z
LAST-MODIFIED:20251217T163153Z
UID:10001185-1793093400-1793098800@tbrpc.org
SUMMARY:Stormwater Management Public Education & Training Committee
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/stormwater-management-public-education-training-committee-4/
CATEGORIES:Online Event
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/10/TBRPC-2-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20261106T100000
DTEND;TZID=America/New_York:20261106T110000
DTSTAMP:20261020T091544
CREATED:20261013T191255Z
LAST-MODIFIED:20261013T191255Z
UID:10001257-1793959200-1793962800@tbrpc.org
SUMMARY:Tampa Bay Regional GIS Data & Technology Group
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/tampa-bay-regional-gis-data-technology-group-4/
CATEGORIES:Online Event
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/10/TBRPC-4-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20261109T100000
DTEND;TZID=America/New_York:20261109T120000
DTSTAMP:20261020T091544
CREATED:20261002T123250Z
LAST-MODIFIED:20261002T123250Z
UID:10001256-1794218400-1794225600@tbrpc.org
SUMMARY:Comprehensive Economic Development Strategy (CEDS) Committee - Workforce Constraints: Housing\, Affordability\, and Childcare
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/comprehensive-economic-development-strategy-ceds-committee-workforce-constraints-housing-affordability-and-childcare/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Hybrid: In-Person and Online Event
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/10/TBRPC-3-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261111
DTEND;VALUE=DATE:20261112
DTSTAMP:20261020T091544
CREATED:20251106T212524Z
LAST-MODIFIED:20251112T155405Z
UID:10001161-1794355200-1794441599@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-4-2/2026-11-11/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20261118T093000
DTEND;TZID=America/New_York:20261118T103000
DTSTAMP:20261020T091544
CREATED:20260120T210806Z
LAST-MODIFIED:20260709T143821Z
UID:10001217-1794994200-1794997800@tbrpc.org
SUMMARY:Hazardous Materials Emergency Preparedness (HMEP) Subcommittee Quarterly Meeting
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/hazardous-materials-emergency-preparedness-hmep-subcommittee-quarterly-meeting-4/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Hybrid: In-Person and Online Event
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/10/HMEP-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20261118T103000
DTEND;TZID=America/New_York:20261118T120000
DTSTAMP:20261020T091544
CREATED:20260120T211456Z
LAST-MODIFIED:20260709T143718Z
UID:10001218-1794997800-1795003200@tbrpc.org
SUMMARY:Tampa Bay Local Emergency Planning Committee Quarterly Meeting
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/tampa-bay-local-emergency-planning-committee-quarterly-meeting-3/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Hybrid: In-Person and Online Event
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/10/LEPC-01-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20261118T130000
DTEND;TZID=America/New_York:20261118T143000
DTSTAMP:20261020T091544
CREATED:20251217T210453Z
LAST-MODIFIED:20260901T182147Z
UID:10001189-1795006800-1795012200@tbrpc.org
SUMMARY:Stormwater/Infrastructure Work Group
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/stormwater-infrastructure-work-group-5/
CATEGORIES:Online Event
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/12/ABCM-3-scaled.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261126
DTEND;VALUE=DATE:20261128
DTSTAMP:20261020T091544
CREATED:20231127T203116Z
LAST-MODIFIED:20231127T205013Z
UID:10000812-1795651200-1795823999@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-3/2026-11-26/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20261210T090000
DTEND;TZID=America/New_York:20261210T120000
DTSTAMP:20261020T091544
CREATED:20251217T154213Z
LAST-MODIFIED:20251217T154213Z
UID:10001181-1796893200-1796904000@tbrpc.org
SUMMARY:Agency on Bay and Coastal Management
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/agency-on-bay-and-coastal-management-4/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Hybrid: In-Person and Online Event
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/12/ABCM-3-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20261214T090000
DTEND;TZID=America/New_York:20261214T100000
DTSTAMP:20261020T091544
CREATED:20260109T204907Z
LAST-MODIFIED:20260413T144747Z
UID:10001208-1797238800-1797242400@tbrpc.org
SUMMARY:Executive Budget Committee
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/executive-budget-committee-6/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Hybrid: In-Person and Online Event
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/10/TBRPC-3-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20261214T100000
DTEND;TZID=America/New_York:20261214T120000
DTSTAMP:20261020T091544
CREATED:20260109T195459Z
LAST-MODIFIED:20260413T162928Z
UID:10001203-1797242400-1797249600@tbrpc.org
SUMMARY:Council Meeting
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/council-meeting-7/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Hybrid: In-Person and Online Event
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/10/TBRPC-3-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261225
DTEND;VALUE=DATE:20261226
DTSTAMP:20261020T091544
CREATED:20231127T205200Z
LAST-MODIFIED:20231127T205200Z
UID:10000821-1798156800-1798243199@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-5/2026-12-25/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
DTSTAMP:20261020T091544
CREATED:20231127T185905Z
LAST-MODIFIED:20231127T190035Z
UID:10000738-1798761600-1798847999@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-1/2027-01-01/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20270118
DTEND;VALUE=DATE:20270119
DTSTAMP:20261020T091544
CREATED:20231127T200637Z
LAST-MODIFIED:20231127T203258Z
UID:10000748-1800230400-1800316799@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-2/2027-01-18/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20270531
DTEND;VALUE=DATE:20270601
DTSTAMP:20261020T091544
CREATED:20231127T203752Z
LAST-MODIFIED:20231127T203752Z
UID:10000773-1811721600-1811807999@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed/2027-05-31/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20270619
DTEND;VALUE=DATE:20270620
DTSTAMP:20261020T091544
CREATED:20240617T140750Z
LAST-MODIFIED:20240617T140750Z
UID:10000974-1813363200-1813449599@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-8/2027-06-19/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20270703
DTEND;VALUE=DATE:20270704
DTSTAMP:20261020T091544
CREATED:20240701T140535Z
LAST-MODIFIED:20250627T163724Z
UID:10001135-1814572800-1814659199@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-9/2027-07-03/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20270704
DTEND;VALUE=DATE:20270705
DTSTAMP:20261020T091544
CREATED:20231127T204616Z
LAST-MODIFIED:20231127T204616Z
UID:10000783-1814659200-1814745599@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-2/2027-07-04/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20270906
DTEND;VALUE=DATE:20270907
DTSTAMP:20261020T091544
CREATED:20231127T204718Z
LAST-MODIFIED:20231127T204718Z
UID:10000793-1820188800-1820275199@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-3/2027-09-06/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20271111
DTEND;VALUE=DATE:20271112
DTSTAMP:20261020T091544
CREATED:20251106T212524Z
LAST-MODIFIED:20251112T155405Z
UID:10001162-1825891200-1825977599@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-4-2/2027-11-11/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20271125
DTEND;VALUE=DATE:20271127
DTSTAMP:20261020T091544
CREATED:20231127T203116Z
LAST-MODIFIED:20231127T205013Z
UID:10000813-1827100800-1827273599@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-3/2027-11-25/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20271225
DTEND;VALUE=DATE:20271226
DTSTAMP:20261020T091544
CREATED:20231127T205200Z
LAST-MODIFIED:20231127T205200Z
UID:10000822-1829692800-1829779199@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-5/2027-12-25/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20280101
DTEND;VALUE=DATE:20280102
DTSTAMP:20261020T091544
CREATED:20231127T185905Z
LAST-MODIFIED:20231127T190035Z
UID:10000739-1830297600-1830383999@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-1/2028-01-01/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20280117
DTEND;VALUE=DATE:20280118
DTSTAMP:20261020T091544
CREATED:20231127T200637Z
LAST-MODIFIED:20231127T203258Z
UID:10000749-1831680000-1831766399@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-2/2028-01-17/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20280529
DTEND;VALUE=DATE:20280530
DTSTAMP:20261020T091544
CREATED:20231127T203752Z
LAST-MODIFIED:20231127T203752Z
UID:10000774-1843171200-1843257599@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed/2028-05-29/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20280619
DTEND;VALUE=DATE:20280620
DTSTAMP:20261020T091544
CREATED:20240617T140750Z
LAST-MODIFIED:20240617T140750Z
UID:10000975-1844985600-1845071999@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-8/2028-06-19/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20280703
DTEND;VALUE=DATE:20280704
DTSTAMP:20261020T091544
CREATED:20240701T140535Z
LAST-MODIFIED:20250627T163724Z
UID:10001136-1846195200-1846281599@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-9/2028-07-03/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20280704
DTEND;VALUE=DATE:20280705
DTSTAMP:20261020T091544
CREATED:20231127T204616Z
LAST-MODIFIED:20231127T204616Z
UID:10000784-1846281600-1846367999@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-2/2028-07-04/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20280904
DTEND;VALUE=DATE:20280905
DTSTAMP:20261020T091544
CREATED:20231127T204718Z
LAST-MODIFIED:20231127T204718Z
UID:10000794-1851638400-1851724799@tbrpc.org
SUMMARY:Holiday/TBRPC Office Closed
DESCRIPTION:The Economic Value of Hillsborough County’s TrailsThe Tampa Bay Regional Planning Council partnered with the Hillsborough TPO to measure what multi-use trails contribute to the local economy. The study looks at the county’s roughly 48 miles of existing SUN Trail and greenway facilities and estimates their impact on visitor spending\, property values\, household costs\, and jobs. 								\n				\n				\n				\n							\n			\n		\n						\n				\n				\n				\n									\n					\n						\n						\n							\n									Read the Study\n					\n					\n				\n								\n				\n				\n		\n				\n				\n									Key Findings Nearly $10 million in annual economic output from trail-related visitor spending\, supporting 79 jobs\, $3.4 million in wages\, and $1.4 million in tax revenue$8.5 million a year in household transportation savings if just 5% of residents replace one short weekly car trip with a walk or bike ride57\,660 homes sit within a quarter mile of a trail\, representing $23.1 billion in taxable value440 construction job-years from building 25 more miles of traisAdding about 25 miles would create a 73-mile network comparable to the Pinellas Trail. At that scale\, annual output could exceed $21 million\, supporting 171 jobs and $3.1 million in tax revenue. Every $10 million spent supports about 117 construction job-years\, compared to 70 for road widening and 50 for highway expansion.The biggest opportunity isn’t adding miles alone. It’s closing gaps and connecting trails to neighborhoods\, jobs\, and business districts so they work as everyday transportation\, not just recreation. The analysis uses IMPLAN and REMI economic models\, GIS parcel data\, and Pinellas Trail usage as a benchmark. Results are planning-level estimates intended to inform transportation and investment decisions. 								\n				\n				\n				\n																\n															\n															\n				\n				\n		\n				\n				\n									Contact Sarah Vitale\, AICP\, Director of Civic Technology\, at sarah@tbrpc.org or (727) 570-5151 ext. 27.
URL:https://tbrpc.org/event/holiday-tbrpc-office-closed-3/2028-09-04/
LOCATION:Tampa Bay Regional Planning Council\, 4000 Gateway Centre Blvd.\, Suite 100\, Pinellas Park\, FL\, 33782\, United States
CATEGORIES:Holidays
ATTACH;FMTTYPE=image/jpeg:https://tbrpc.org/wp-content/uploads/2023/11/Holiday-scaled.jpg
ORGANIZER;CN="Tampa Bay Regional Planning Council":MAILTO:info@tbrpc.org
END:VEVENT
END:VCALENDAR