Agency on Bay Managment (ABM)


TBEP_License_Plate
Join Our Email List
Email Newsletter icon, E-mail Newsletter icon, Email List icon, E-mail List icon

Staff Contact:

Maya Burke
Senior Planner
4000 Gateway Centre Blvd.
Suite 100
Pinellas Park, Florida 33782
Phone: (727)570-5151 ext. 40

 

Agency on Bay Management Presentation MATERIALS

Links to presentations and other documents related to ABM agenda items.

 

2013

  • Manatee Protection Issues in Western Pinellas County
  • Oyster Reef Creation: Project Design and Implementation in Hillsborough Bay
  • Tampa Bay Aquatic Preserves Update
  •  

    2010

  • Hillsborough County Canal Dredging Program Manual
  • Hillsborough County Canal Dredging Program
  • Pinellas County - Lake Seminole Sediment Removal Project
  • City of St. Petersburg Navigational Waterway Dredge Maintenance Program
  • City of Tampa - Westshore Waterways Environmental Enhancement Project
  • Benthic Community and Sediment Quality Conditions in Clam Bayou
  • Clam Bayou Phase 3 Habitat Restoration and Stormwater Treatment Project Update
  • Electric Vehicles as Part of Our Region’s Innovative Energy and Environmental Solutions
  • Ongoing and Pending Regulatory Activities for the Tampa Bay Area
  • Tampa Harbor General Re-Evaluation and Report Update (U.S. Army Corps of Engineers)
  • Florida's Wildlife Action Plan (Florida Fish and Wildlife Conservation Commission)
  • 2009

  • Proposed Bishop Harbor Boat Ramp
  • 2008

  • Heavy Oil Summary
  • Heavy/Sinking Oils Transported Through Tampa Bay
  • Proposed Legislation Letter
  • Trends in Seagrass Abundance and Density, and Water Quality near the Ft DeSoto Circulation Project
  • MacDill Shoreline Stabilization Project
  • Agency on Bay Management~Gulfstream –Phase IV Expansion
  • Rays Conceptual Ballpark Plan
  • Development of Regional Fertilizer Guidelines
  • Progress Energy
  • Hydrobiological Monitoring Program Overview and Status Report
  • Colonial Waterbird Nesting Egmont Key National Wildlife Refuge/State Park
  • Tampa Bay Nitrogen Management Consortium: RA and TMDL Update
  • 2007

  • Reclassification of Alafia River & Tampa Bypass Canal
  • Henningsen Presentation
  • Davis Presentation
  • April 12, 2007 Summary
  • Clam Bayou Aerial Photo
  • Clam Bayou Restoration Project
  • 2006

  • (Draft) Seagrass Management Action Plan
  • Clues Emerge in South Branch Intersex Fish Study
  • Piney Point Update
  • Alafia Oyster Pilot
  • Spoonbill Project
  • Piney Point Groundwater
  • Mosaic Spill Preassessment
  • Piney Point Report
  • Gulf of Mexico Fishery Management Council
  • Gulf Stream Natural Gas System
  • BMAP
  • HBMP
  • Bartow Plant
  • Cedar Hammock
  • Wares Creek
  • Stacks & Piney Point
  • Tampa Harbor
  • 2005

  • Dredge Holes
  • Draft Water Management
  • Phosphate Items
  • TECO Emissions Reduction
  • Hillsborough River Basin Study
  • MacDill Shoreline
  • Mosaic Spill
  • Essential Fish Habitat
  • Port Sutton
  • Estuary Protection Act
  • LMR Fisheries
  • LMR Invertebrates
  • LMR WQ and Benthos
  • ABM Retrospective Pictures
  • 2004

  • Bishop Harbor
  • Dredge Holes
  • Egmont
  • Piney Point Fuleihan
  • Piney Point Uebelhour
  • Cargill Spill
  • 2003

  • Dredge Holes
  • Bishop Harbor Monitoring
  • Piney Point
  • Piney Point Fuleihan
  • Corps Tampa Harbor
  • Rec Boating
  • Rec Boating 2
  •  

    Under Florida law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone by calling (727) 570-5151 or in writing to 4000 Gateway Centre Blvd., Suite 100, Pinellas Park, Florida 33782. Copyright © 2013 Tampa Bay Regional Planning Council. All Rights Reserved.